You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Banjir, Saluran Phb Kampung Ambon Dikeruk

Kampung Ambon Conduit Dredged

To anticipate flood in rainy season, Kampung Ambon conduit (Phb), on Jalan Bangunan Timur Raya, Kayu Putih, Pulogadung, East Jakarta dredged on Thursday (7/30). The dredged conduit length reaches 4,000 square meters with an average width of 6-10 meters and will be completed at the end of August.

We will dredge Kampung Ambon conduit with a depth of 2 meters

East Jakarta Water Management Sub-Department Head, Ahmad Yazied Bustomi said, the Kampung Ambon conduit is one of 17 conduits that dredged in 2015.

"We will dredge Kampung Ambon conduit with a depth of 2 meters. Two heavy equipment of amphibious type were deployed to dredge the conduit," told Bustomi, Friday (7/31).

C. Jakarta Prepare 242 Janitors at PHB
Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1088 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye571 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye489 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye473 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye470 personBudhi Firmansyah Surapati